Project
Project Cargo Handling
Crating, loading and on-site handling of project equipment — documentation from our field team.
A selection of documentation from our operations team in the field. Each shipment is prepared to suit the cargo: machinery is wrapped and packed in wooden crates at the warehouse, then loaded by forklift onto trucks or into containers.
The album also shows steel pipes and drums being handled in the yard, and goods and documents being checked together with the cargo owner at the port.
More projects
All projects
Other work from our team
12
Project Cargo
LTCS Project
2015Port support for a cable-laying vessel — cable tanks on deck, cable coils on the quay and coordination during the port …
View project
8
Project Cargo
ZF Gokart Project
2015Oversized portable cable tanks carried on a barge and handled with a crawler crane at the port.
View project